Small complex with zinc roof
Construction of an integrated center comprising a 100-square-meter mosque for 160 worshippers, a 5-classroom school, a solar-powered artesian well, a 5-room clinic (zinc roof + suspended ceiling + ceramic flooring), furnished, and 12 bathrooms. Details: *Mosque for 160 worshippers, 100 square meters, with a zinc roof, concrete foundation, iron doors and windows, 3 bathrooms, and 3 light wells. Interior furnishings: Mosque carpets + 2 loudspeakers + 6 lamps + 50 copies of the Quran with shelves (Friday prayers are held there) *School with 5 classrooms, accommodating 150 students, with an area of 225 square meters, including an administration office, a zinc roof, false ceilings, ceramic tile flooring, iron doors and windows, 5 bathrooms, and furnishings: 150 school desks, 5 teachers' desks *Clinic (5 rooms + reception room) with an area of 75.5 square meters, with a zinc roof, false ceiling, marble flooring, iron doors and windows, 2 bathrooms, and furnishings including: 6 fans, 16 lamps, 5 beds, 12 chairs, and 6 tables. *An artesian well, 70-80 meters deep, with a solar-powered electric pump, a backup generator (Honda 2000 watts), a 10,000-liter tank, and water pipe extension. The lifespan is 20 years (covered with a tile and then a ceramic floor).
Category
Residential complexes and villages
Country
UGANDA
Amount
611,060.00AED
Remaining amount
611,060.00AED
Collected amount
0.00 AED
IMPORTANT NOTE ABOUT YOUR PROJECT
Please note that if the targeted amount for the project created by you and shown via the link is not completed (within six months) since the date of creating the link, the collected amount will be transferred to (a similar project) for the project as a contribution for which the targeted amount was not completed.
And the donor has no right to request a refund or change it to another project after creating the link. We also inform you that at the beginning of each calendar year, contracts with external implementing parties are updated, which -sometimes - results in a difference in the cost of the project and thus prices may change.