Masjid khalifa memorial center
"Construction of an integrated center consisting of a 500 square meter mosque for 795 worshippers, a 12-classroom school, a solar-powered artesian well, an 11-room clinic (zinc roof + false ceiling + ceramic flooring), furnished, and 16 bathrooms. Details: A mosque with a capacity of 795 worshippers, covering an area of 500 square meters, featuring a zinc roof, a concrete foundation, iron doors and windows, and 7 restrooms and 13 light wells. Interior furnishings include: carpets, 4 loudspeakers, 10 lamps, and 400 copies of the Quran with shelves. (Friday prayers are held here.) A 12-classroom school with a capacity of 360 students, covering an area of 540 square meters, including an administration office, a zinc roof, false ceilings, ceramic tile flooring, iron doors and windows, and 12 bathrooms. Furnishings include 360 school desks and 12 teachers' desks. *Clinic (11 rooms + reception room) with an area of 149 square meters, featuring a zinc ceiling, false ceilings, marble flooring, iron doors and windows, 5 bathrooms, and furnishings including: 12 fans, 28 lamps, 11 beds, 24 chairs, and 12 tables. *70-80 meter artesian well with solar-powered electric pump + backup generator (Honda 2000 watt type) + 10,000 liter tank + water extension - lifespan of 20 years (covered with a slab, ceramic flooring above it)
Category
Residential complexes and villages
Country
UGANDA
Amount
1,542,090.00AED
Remaining amount
1,542,090.00AED
Collected amount
0.00 AED
IMPORTANT NOTE ABOUT YOUR PROJECT
Please note that if the targeted amount for the project created by you and shown via the link is not completed (within six months) since the date of creating the link, the collected amount will be transferred to (a similar project) for the project as a contribution for which the targeted amount was not completed.
And the donor has no right to request a refund or change it to another project after creating the link. We also inform you that at the beginning of each calendar year, contracts with external implementing parties are updated, which -sometimes - results in a difference in the cost of the project and thus prices may change.