IMPORTANT NOTE ABOUT YOUR PROJECT :
Please note that if the targeted amount for the project created by you and shown via the link is not completed (within six months) since the date of creating the link, the collected amount will be transferred to (a similar project) for the project as a contribution for which the targeted amount was not completed.
And the donor has no right to request a refund or change it to another project after creating the link. We also inform you that at the beginning of each calendar year, contracts with external implementing parties are updated, which -sometimes - results in a difference in the cost of the project and thus prices may change.
Small complex with zinc roof
Construction of a fully integrated zinc-roofed center consisting of a mosque for 160 worshippers (100 m²), an artesian well (80-110 m), and a school for 90 students (135 m²). Details: 1- Mosque for 160 worshippers with an area of 100 square meters, zinc roof, concrete foundation, iron doors and windows, 3 bathrooms + 3 ablution areas. Interior furnishings: carpet, 2 loudspeakers, 9 lamps, 7 fans, 50 Qurans with a shelf, 2 solar panels, 1 battery, 1 power inverter. 2- Artesian well (80-110 m) with mechanical driller and accessories + plastic water tank with 2000-liter capacity + pipes + electric pump (Pump bona) with a capacity of 2000 liters per hour. + 4 solar panels with fencing, life expectancy 10-15 years. 3- School with 3 classrooms for 90 students, 135 square meters, zinc roof, concrete foundation, iron doors and windows, and 3 bathrooms. Furnishings: 45 student desks, 3 teacher tables, 3 teacher chairs, chalk.
Category
Residential complexes and villages
Country
BENIN
Amount
194,795.00AED
Remaining amount
194,735.00AED
Collected amount
60.00 AED