Small complex with zinc roof
Construction of an integrated center with a zinc roof, consisting of a 100m² mosque for 160 worshippers, a bucket-dug well, a 135m² school for 90 students, and a 140m² clinic, including furnishing and equipment. Details: 1) Mosque for 160 worshippers, 100m², built of cement with a reinforced concrete foundation, brickwork, and a zinc and insulating wood roof. Includes a minaret, three 4.5m² restrooms, and ablution facilities for three people each (1.5m²). Interior furnishings: 40 copies of the Quran with shelves, mats, two microphones, a pulpit, three loudspeakers, four internal speakers, two fans, lighting, a sound system, and three solar panels. (Friday prayers will be held here.) 2) A 10m deep, hand-dug shallow well, hollowed out internally with cement and iron, with an iron cover for the wellhead and a retaining wall. Small cement trough + livestock watering trough + bucket Lifespan: 10-20 years 3) A 3-classroom school accommodating 90 students, with an area of 135 square meters, featuring a zinc roof, concrete foundation, iron doors and windows, and 3 restrooms. Furnishings: 90 student desks + 3 teachers' desks + 3 whiteboards 4) A 140-square-meter clinic comprising a doctor's office (24 m²) + examination room (30 m²) + waiting room (36 m²) + first aid room (28 m²) + storage room (14 m²) + 2 restrooms (16 m²) Fully equipped
Country
Togo
Category
Residential complexes and villages
Amount
274,975.00 AED