“Filtering a channel with a length of 3500 meters And a water network.”
Channel length: 3500 metres. Channel width: 3 metres. Channel depth: 2.5 metres Excavator type: DOOSAN 220. Delivery pipe length: 3000 meters Pipe diameters: 100mm, 76mm, 32mm, 20mm Water storage tank: 15,000 litres. Installing an electric pump: 6 kilowatts Building an electricity room: unspecified area. Faucets: 10 faucets Number of beneficiaries: 500 families”
Country
TAJIKISTAN
Category
Watering Water
A medium-sized complex with a reinforced ceiling.
"Building an integrated complex with an armed roof consisting of a mosque of 80 square meters for 125 worshipers, digging an electric well 50-80 meters, a school for 120 students, in addition to an average clinic with an area of 110 square meters. Details: 1- Mosque 125 worshipers with an area of 80 square meters of red bricks with reinforced roof, concrete foundation, iron doors and aluminum windows + lighthouse + 2 speakers + mats + 4 bathrooms + 1 place for ablution + 14 lamps + 11 fans + 60 Qur'ans with shelves 2- Well with electric pump depth (50-80 meters) with solar energy, water tank capacity of 5000 liters and 06 taps, life span (20 years) 3- A 6-classroom school that can accommodate 120 students with an area of 270 square meters of cement bricks with reinforced roof, concrete foundation, iron doors and aluminum windows with 6 bathrooms + furnishing (60 seats + 6 tables) + 12 fans + 12 lamps 4- Dispensary 4 rooms and a hall 110 m 2: examination room 2 nursing rooms and a delivery room of cement bricks with reinforced roof, concrete foundation, iron doors and windows of aluminum + 2 bathrooms + 4 beds + 4 fans + 8 lamps "
Country
GHANA
Category
Residential complexes and villages
"Building area 63m2 with 3 bathrooms, building materials: cement and bricks with paint, roof type: zinc, floor type: cement, doors and windows: iron Training details: 1- Training topics such as Windows basics, Microsoft programs, Adobe programs and printing 2- Training supplies (16 chairs - office equipment - projector (1) - tables (1 square rectangular) - air conditioner number 1 - multi-function printer (1) - center lighting) 3- Obtaining a certificate of experience and marketing them in the labor market (15) Operating costs: Training fees, course duration 4 months, number of trainees in each course: 30 people"
Country
NIGER
Category
Training Centers
Providing professional machines for people with disabilities
Electric drill for people with disabilities: Bosch Electric Drill | Bricosor, Type: 750 W GBM 13-2 RE Pro-06011B2002
Country
BURKINA FASO
Category
People of Determination Projects Outside UAE
Providing water in the places where workers are located in the summer
Country
UNITED ARAB EMIRATES
Category
Summer Heat Campaign Inside
A chair + table that accommodates 3 students made of natural wood.
Country
NIGERIA
Category
Education Support inside UAE
Adding solar energy to a mosque of 300-500 m2, number of panels 1 x 100 WATTS 12 V, 6 lamps, 2 sockets, wires, 1 x 12 V battery, and 1 INVETOR.
Country
MALAWI
Category
Renewable Energy Projects
A mosque for 125 worshipers with an area of 80 square meters, with a zinc roof, a concrete foundation, iron doors and windows, 2 bathrooms + 3 lighting fixtures + a minaret. Interior furnishings: mosque carpets + 1 loudspeaker + 2 lamps + 2 fans + 10 copies of the Holy Quran with shelves + solar energy.
Country
BURKINA FASO
Category
Mosques